Executive Control Centre

Friday, 23 October 2026 · Shift A · Updated 8 minutes ago

ViewingSource: loading
Control Centre
Finite capacity

Capacity Workbench

Surface bottlenecks, test a reallocation, and make the impact visible before release.

23 Oct 2026 · Demo plan
Filters

Recommended recovery action

Move 50% of PO-NSO-2481 from blocked Line 03 to Line 04. The demo scenario preserves the dispatch commitment.

Network load
Required minutes across all lines.

99%

Overload minutes
Capacity requiring a decision.

5,500

Available headroom
Recoverable minutes on healthy lines.

6,100

Bengaluru Apparel Works
Bengaluru, Karnataka · 2 tracked sewing lines
watch

Line 01

Lockstitch · 16,200 required / 18,000 available

Utilization90%
x
Healthy
1,800 min headroom

Line 02

Overlock · 18,900 required / 18,000 available

Utilization105%
x
Overloaded
900 min over
Tiruppur Knitwear Unit
Tiruppur, Tamil Nadu · 2 tracked sewing lines
healthy

Line 03

Flatlock · 21,400 required / 16,800 available

Utilization127%
x
Overloaded
4,600 min over

Line 04

Lockstitch · 14,600 required / 18,900 available

Utilization77%
x
Healthy
4,300 min headroom
Capacity snapshots and scenario decisions are persisted in the connected ppc schema. Tenant authorization and audit policy remain future production controls.