Executive Control Centre

Friday, 23 October 2026 · Shift A · Updated 8 minutes ago

ViewingSource: loading
Back to Docs

Decision guide

Know which screen owns the next decision

Each page is a practical lens on the same production story. Start with the operating question, then use the signals and actions that are live in this prototype.

Control Centre
Primary perspective: Leadership
Open Control Centre

The operating question

Which delivery commitment needs a decision now?

Where to go next

Open the affected order or exception to understand the commitment and its constraint.

Key signals to read

  • Delivery outlook
  • Capacity pressure
  • Ranked exceptions
  • Scenario impact

Available in this prototype

Open an orderInvestigate capacityReview an exception
Order 360
Primary perspective: Leadership · Planner · Supervisor
Open Order 360

The operating question

Can we still honour this buyer commitment?

Where to go next

Move to capacity or the plan when the commitment needs recovery work.

Key signals to read

  • Committed dispatch date
  • Good output
  • Critical path
  • Delivery risk

Available in this prototype

Switch the viewed orderOpen its planOpen its exception
Plan Builder
Primary perspective: Planner
Open Plan Builder

The operating question

Which allocation and plan version should go to the floor?

Where to go next

Use Capacity Workbench to record a recovery option before release. In this prototype, saving clears the local edit marker and release changes only the version status; edited allocations do not carry to execution.

Key signals to read

  • Plan version
  • Line allocation
  • Quantity share
  • Capacity impact

Available in this prototype

Select a versionEdit local allocation fieldsSave a local draft markerRelease a plan version
Capacity Workbench
Primary perspective: Planner
Open Capacity Workbench

The operating question

Where is capacity constrained and what recovery option protects delivery?

Where to go next

Return to Plan Builder to discuss the chosen recovery option. Scenario creation records a local option only; this prototype does not compare scenarios or recalculate capacity metrics.

Key signals to read

  • Utilization
  • Overload minutes
  • Available headroom
  • Locally saved scenario name

Available in this prototype

Inspect a lineCreate a local scenario recordReview suggested recovery options
Shop-floor
Primary perspective: Supervisor
Open Shop-floor

The operating question

What is happening on this line during the current shift?

Where to go next

Go to Exceptions to inspect or own a constraint. Record downtime or output to update the local session; the next-operation control is a simulated confirmation only.

Key signals to read

  • Line state
  • Shift output
  • Efficiency
  • Recent events

Available in this prototype

Post outputRecord downtimeStart next operation (simulated feedback)
Exceptions
Primary perspective: Leadership · Planner · Supervisor
Open Exceptions

The operating question

Who owns this operational risk and what action will resolve it?

Where to go next

Return to the plan or Control Centre once the action and its delivery impact are clear.

Key signals to read

  • Severity
  • Owner
  • Due date
  • Recommended action

Available in this prototype

AcknowledgeInvestigateStart an actionClose an exception
Production Gantt
Primary perspective: Leadership · Planner
Open Production Gantt

The operating question

Where do dependencies or timing put an order at risk?

Where to go next

Open the relevant Order 360 or Plan Builder view to decide what changes. The Gantt shows the whole demonstration timeline and does not apply the selected factory context.

Key signals to read

  • Milestone sequence
  • Blocked work
  • Schedule window
  • All-demo order timeline

Available in this prototype

Read milestone timingReview dependency health
Factory Configuration
Primary perspective: Platform administrator
Open Factory Configuration

The operating question

Are the factory settings and planning guardrails trustworthy?

Where to go next

Return to an operating screen to understand how those guardrails affect a decision.

Key signals to read

  • Factory profile
  • Line setup
  • Capacity thresholds
  • Data freshness guard

Available in this prototype

Review the demonstration configuration