Executive Control Centre

Friday, 23 October 2026 · Shift A · Updated 8 minutes ago

ViewingSource: loading
Control Centre
System configuration

Factory Configuration

Maintain the master data and guardrails that make plans and exceptions trustworthy.

23 Oct 2026 · Demo plan
Factories
Network entities and operational health.
Factory profile
Bengaluru Apparel Works · BLR-01 · Shift A 07:00–15:30
Production lines
Line-level capability and planning defaults.

Line 01 · L01

Lockstitch · 38 headcount · target 820/shift

82% efficiency

Line 02 · L02

Overlock · 36 headcount · target 760/shift

76% efficiency
Capacity thresholds
Rules used for heat maps and exception ranking.

Watch threshold

Flag lines at or above 95% utilization.

Critical overload alerts

Create an exception when required exceeds availability.

Stale data warning

Mark views stale after 15 minutes.

Factory configuration is currently a read-only demonstration view. Records can be loaded from the connected ppc schema; configuration writes, tenant authorization, and audit policy are future production controls.

Stale data

Data freshness guard

Operational views show a stale-data state when a factory feed has not refreshed within the configured window.