Finite capacity
Capacity Workbench
Surface bottlenecks, test a reallocation, and make the impact visible before release.
23 Oct 2026 · Demo plan
Filters
Recommended recovery action
Move 50% of PO-NSO-2481 from blocked Line 03 to Line 04. The demo scenario preserves the dispatch commitment.
Network load
Required minutes across all lines.
99%
Overload minutes
Capacity requiring a decision.
5,500
Available headroom
Recoverable minutes on healthy lines.
6,100
Bengaluru Apparel Works
Bengaluru, Karnataka · 2 tracked sewing lines
watch
Line 01
Lockstitch · 16,200 required / 18,000 available
Utilization90%
1,800 min headroom
Line 02
Overlock · 18,900 required / 18,000 available
Utilization105%
900 min over
Tiruppur Knitwear Unit
Tiruppur, Tamil Nadu · 2 tracked sewing lines
healthy
Line 03
Flatlock · 21,400 required / 16,800 available
Utilization127%
4,600 min over
Line 04
Lockstitch · 14,600 required / 18,900 available
Utilization77%
4,300 min headroom
Capacity snapshots and scenario decisions are persisted in the connected
ppc schema. Tenant authorization and audit policy remain future production controls.